Preparation For Starting Up - WAGNER AC 4600 Operating Manual

Aircoat spray guns for flat - and round jet nozzles
Hide thumbs Also See for AC 4600:
Table of Contents

Advertisement

EDITION 02/2009
OPERATING MANUAL
5.3.2

PREPARATION FOR STARTING UP

1. Secure the spray gun.
2. Connect material hose to the spray gun and material supply system.
3. Connect air hose to spray gun and to oil-free, dry air supply with regulator.
4. Insert suitable gun fi lter.
5. Place the nozzle into the nozzle seal. Fit the air cap over the nozzle, ensuring that the
location fl ats (X) are in line. Fit the union nut with nozzle guard and tighten by hand.
6. Visually check the permissible pressures for all the system components.
7. Make sure that the unit and all other conductive parts within the work area are
earthed.
8. Set material pressure at 100 bar; 10 MPa; 1450 psi and use a suitable medium (solvent
or water) to check that connections do not leak.
Note:
Pull the trigger and then release, checking that the gun closes cleany.
9. Relieve spray gun and unit pressure and secure the spray gun.
Operating the gun with a coating material with a temperature
higher than 43°C; 109.4°F
Burns from hot surface (to 60°C; 140°F)
SIHI_0135_GB
PART NO. DOC394871
Wear antistatic protective gloves:
Identify the spray gun with a warning label that says „Warning
- hot surface"( Part No. 9998910 or 9998911).
WARNING
AC 4600 Pro
B_02261
x
20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ac 4600 professional

Table of Contents