Preparation For Starting Up - WAGNER AirCoat GM 4600AC-H Translation Of The Original Operating Manual

Spray gun for flat - and round jet nozzles
Table of Contents

Advertisement

EDITION 05/2011
OPERATING MANUAL
5.3.2

PREPARATION FOR STARTING UP

1. Secure the spray gun.
2. Connect material hose to the spray gun and material supply system.
3. Connect air hose to spray gun and to oil-free, dry air supply with regulator.
4. Insert suitable gun fi lter
5. Place the nozzle into the nozzle seal. Fit the air cap over the nozzle, ensuring that the
location fl ats (X) are in line. Fit the union nut with nozzle guard and tighten by hand.
6. Visually check the permissible pressures for all the system components.
7. Make sure that the unit and all other conductive parts within the work area are
earthed.
8. Set material pressure 100 bar; 10 MPa; 1450 psi and use a suitable medium (solvent or
water) to check that connections do not leak.
Note:
Pull the trigger and then release, checking that the gun closes cleany.
9. Relieve spray gun and unit pressure and secure the spray gun.
Part No. DOC394861
GM 4600AC
B_02261
x
20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aircoat gm 4600ac

Table of Contents