Step 4, Remove Access Panel And Toekick; Step 5, Install Power Cord (If Used); Step 6, Install 90° Elbow - GE ZBD3500 BB Installation Instructions Manual

Cleansensor dishwashers with optional trim kit
Hide thumbs Also See for ZBD3500 BB:
Table of Contents

Advertisement

• Remove the two screws below the access
Step 4
Remove
• Loosen the two screws located between the
Access Panel
And Toekick
Step 5
Install
Power Cord
(If Used)
Skip this step
If dishwasher
will be wired
direct.
Step 6
Install 90°
Elbow
panel and set aside.
door and access panel. Do not attempt to
remove these screws. They are secured to
the access panel with washers.
• Remove the junction box cover and install
strain relief and power cord.
The power cord and connections must
comply with the national Electrical Code,
Section 422 and/or local codes and ordi-
nances.
• The cord must be no longer than 6 ft. from
the junction box to the receptacle.
• Connect incoming wires, white to white,
black to black and ground to green wire.
Use UL listed wire nuts of appropriate size.
• Replace the junction box cover. Check to be
sure wires are not pinched under the cover.
• The water valve requires 3/8" NPT fitting
with external threads. The opposite end
should fit water supply line.
• Install the 90° elbow fitting to the water
valve using thread seal tape.
• Position the end of the elbow to face the
rear of the dishwasher.
Caution: Do not bend the dishwasher frame when installing the
90° elbow fitting to the water valve. This could cause the door
spring to come in contact with the fill hose.
Installation
CleanSensor Dishwasher
Back Out
2 Screws
Note: Check That Harness Leads Are
Threaded Thru Small Hole in Bracket
White
Ground
Neutral
90°
Elbow
Thread
Seal
Tape
Remove 2
Screws
Black
Live
12

Advertisement

Table of Contents
loading

Table of Contents