Water Supply; Double Dishwashers - GE ZBD3500 BB Installation Instructions Manual

Cleansensor dishwashers with optional trim kit
Hide thumbs Also See for ZBD3500 BB:
Table of Contents

Advertisement

Water
Supply
• Hot water line may enter from either side,
• Cut a hole approximately 1-1/2" in diam-
• Install a hand shut-off valve in the supply
When installing two dishwashers side-by-side,
Double
route the water supply line as shown.
Dishwashers
from the rear, or from the floor within the
shaded area shown.
eter to admit water line.
line in an accessible location, such as under
the sink. (The shut-off valve is optional, but
recommended and may be required by local
codes.)
– Follow installation instructions for each
dishwasher.
Installation Preparation
1-1/2" Dia.
5"
Hole
Shut-off
Valve
Hot
2"
from
19" from Wall
Cabinet
Cabinet Face
• Water connection is on the left side of the
dishwasher. Install hot water line using no
less than 3/8" O.D. copper tubing or 1/2"
O.D. plastic tubing. Route water line as
shown and extend the line forward at least
19" from the rear wall.
• Allow at least 2" clearance between water
line and adjacent cabinet wall as shown.
• Before connecting, flush water line to clean
out debris.
Water Supply For 2-Dishwasher Installation
1/2" O.D. Copper
Recommended To Here
CleanSensor Dishwasher
4"
4"
5"
6"
2" from Floor
5"
4"
5"
5"
Cut Off Valve
Optional
Toe
Space
48" Min.
4" 5" 4"
6"
24"
8

Advertisement

Table of Contents
loading

Table of Contents