Installation & operation manual
Routing from the appliance(s) to the node
1. Lay-out the wires from the appliance
to where the node will be placed.
2. Cut the wires to the correct length.
Allow extra length to tighten up the
cables with tie-wraps. Refer to the
drawing.
3. Attach the connectors on the end of
the wires.
Node
4. Lay-out single appliances directly to
the node.
5. Lay-out group appliances parallel to
the node.
B L U E
P O W E R
Node
9