Victron energy VE.Net DC Installation & Operation Manual page 15

Bus-based power distribution system
Table of Contents

Advertisement

Installation & operation manual
4. Insert the labels in the cover.
Note:
Switch 1 and 4 are reserved for
the bilge-pump.
If necessary, make new labels
with the delivered CD.
Use an overhead sheet to print
the labels.
Bus
GND
Violet
Black
VBAT
Red
5. Connect the wires to the electronics.
6. Replace the front cover.
B L U E
P O W E R
15

Advertisement

Table of Contents
loading

Table of Contents