Connect the direct power nodes (DPN)

12
11
DPN
1. Start from the main fuse box.
2. Clamp the 10 A Direct Power Node
(DPN) wires to the instruments.
If necessary, install a multiple fuse
box with a total of 10 A between the
different instruments and the node.
Refer to the illustration.
3. Clamp the 20 A DPN wires to the
bilge-pump.
Note: Do not connect the wires to the
appliances mentioned.
30 cm
12
12"
11
Fusebox
Max 10 A
4. Attach the wires for the push button
panel. Leave 30 – 40 cm (12 – 16")
extra length for easy connection of
the switch panel.
5. Attach the wires with a clamp every
30 cm (12").
Note: Clamp the wires of the
instruments, bilge-pump and switch
board separated from the bus cable.
B L U E
P O W E R
Caution!
The instruments and VHF
may need a separate fuse.
Refer to the instrument user
manual.