Clearances; Mantel & Trim; Alcove; Stove And Vent Clearance Requirements - Jøtul GF 300 BV Allagash Installation And Operation Instructions Manual

Direct vent gas stove
Table of Contents

Advertisement

Stove and Vent Clearance
Requirements
Minimum Clearances from the Stove
to Combustibles
See figs. 2-3.
Rear:
2" (51 mm) - measured from Draft Hood
Ceiling:
32 1/4" (819 mm) - measured from stove top
Corner:
3" (76 mm) - measured from stove top
Sides:
3" (76 mm) - measured from stove top
Minimum Clearances from the Vent Pipe to
Combustibles
Horizontal Run:
Top:
Off the top of the pipe
Sides: Off the sides and bottom 2" (50 mm)
Vertical Run:
All sides: 1" (25 mm)
All vent components must be installed in accordance
with the manufacturer's instructions and within the
terms of their listing. Refer to the manufacturer's instruc-
tions for approved clearances from the vent pipe to
combustible materials.
Minimum Alcove Dimensions
Maintain clearances to combustibles as noted above.
Width:
36" (914 mm)
Depth:
24" (610 mm)
Height:
61" (1550 mm)
Mantel Clearances -
56 3/4”
53 3/4”
50 3/4”
1441 mm
1365 mm
1289 mm
55 1/4”
27 3/4”
52 1/4”
1403 mm
1327 mm
705 mm
Figure 4. Mantel and Trim specifications -
Stove installed flush with fireplace face.
2" (50 mm)
Stove shown with standard legs. With Short Legs, subtract 2 1/4" (51 mm)
from the clearances indicated below.
Max. Mantel Depth
11.5”
9.5”
7.5”
5.5”
3.5”
Min. Mantel Depth
Max. Top Trim
Depth = 1”
1”
11”
(266 mm)
3"
(76 mm)
Figure 2. Parallel Installation Clearances.
3”
(76 mm)
Figure 3. Vent adaptor centerline at minimum clearance
to corner walls.
705 mm
Figure 4a. Mantel specifications -
Stove recessed into fireplace no more than 6 1/2".
2"
(51 mm)
To Rear Wall
3"
(76 mm)
11 3/4”
(298 mm)
34”
11 3/4”
(864 mm)
(298 mm)
3”
(76 mm)
Mantel Depths
Mantel Sheild:
as in Fig.4.
Min. 24 ga. steel
26” wide on 1”
spacers
No Top Trim
27 3/4”
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents