Main Electrical Supply Connection - Meiko FV 130.2 Owner's Installation, Operation And Maintenance Manual

High temperature sanitizing pot and pan washer (usa version)
Table of Contents

Advertisement

S
3 - I
ECTION
NSTALLATION

3.5 Main Electrical Supply Connection

WARNING!
Check that the circuit breaker/fused
disconnect is in the OFF position and
that the unit is switched off before
making the electrical utility connections.
IMPORTANT
In some cases, local codes dictate that
electrical supply connections be made only
by a certified professional.
1. Check that the incoming power leads are
of sufficient rating for the appliance's
current draw. Amperage and minimum
supply wire specifications are shown on
the serial plate and on the electrical
information label on the terminal block
cover plate.
Figure 3-3: Utility connections
Liquid
detergent and
rinse additive
supply lines (if
so equipped)
Fresh water
connection
Page 6
Lower rear
of machine
Drain
Electrical
hose
supply
strain relief
Figure 3-5: Main electrical supply connections
L1
L2
L3
2. Check that the incoming power leads are
long enough to permit the unit to be
repositioned for servicing.
3. Locate the strain relief for the electrical
supply wiring at the lower rear of the
machine (Figure 3-3). Thread the
incoming supply leads through the strain
relief and to the main electrical supply
terminal block at the front of the machine
(Figure 3-4).
4. Refer to Figure 3-5 and the electrical wiring
diagram. Connect the power supply and
ground leads as indicated.
5. Adjust the strain relief to fasten the wiring
in place. You should leave enough slack
in the wiring to prevent stress on the
terminal connections.
6. Replace the cover above the main
terminal block.
Figure 3-4: Routing the
Main
electrical
supply
terminal
block
208-230V, 60Hz, 3 Phase
G
or
N
D
460V, 60 Hz, 3 Phase
L1, L2 and L3 "hot" (line)
yel/grn = ground
electrical supply
Lower front
of machine

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents