Mounting Instructions For Using Wall Bracket; Mains Supply; Battery Operation - KERN EOB Operation Instructions Manual

Platform/floor scales
Hide thumbs Also See for EOB:
Table of Contents

Advertisement

7.2.3 Mounting instructions for using wall bracket

7.3 Mains supply

Electric power supply is by means of the external mains supply circuit. The printed
voltage level must comply with the local voltage.
Only use original KERN mains supply circuits. The use of other makes is subject to
approval by Kern.

7.4 Battery Operation

Remove the battery cover underneath the display. Connect 6 x 1,5V round cells. Re-
insert the battery cover.
Battery conservation through automatic power-off 3 minutes after ending a weighing
operation.
When the battery power is used up the display will show "LO". Press the OFF key
and change the batteries at once.
When the balance is not in use for a longer period of time remove batteries and keep
them separately. Leakage of battery liquid might damage the balance.
EOB/EOE/EOB/EOS/BOBP-BA-e-0620
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents