Installation; Unpacking The Balance; Package Volume - KERN EOB Operation Instructions Manual

Platform/floor scales
Hide thumbs Also See for EOB:
Table of Contents

Advertisement

7.2 Installation

Install the balance in such a fashion that the weighing plate is absolutely horizontal.

7.2.1 Unpacking the Balance

Carefully remove the balance from the packaging and out of the plastic covering,
then place the balance on the assigned position.

7.2.2 Package volume

Serial fittings:
KERN EOB
• Platform (stainless steel weighing plate) and display device
• 4 x Adjusting feet (except platform 310 x 300)
• Mains device
• Wall bracket (with anchoring screws
• Operating instructions
KERN EOE
• Platform and display device
• 4 x Adjusting feet
• Mains device
• Wall bracket (with anchoring screws
• Operating instructions
KERN EOS
• Platform (stainless steel weighing plate) and display device
4 x Adjusting feet
• Mains device
• Rubber mat
• Wall bracket (with anchoring screws)
• Operating instructions
KERN BOBP
• Platform and display device
• 4 x Adjusting feet
• Mains device
• Wall bracket (with anchoring screws
• Operating instructions
16
EOB/EOE/EOS/BOBP-BA-e-0620

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents