Verify The Switch Passes Self Test - HP ProCurve Series Installation And Getting Started Manual

Hewlett-packard switch installation & getting started guide
Hide thumbs Also See for ProCurve Series:
Table of Contents

Advertisement

5. Verify the Switch Passes Self Test

Before mounting the switch in its network location, you should first verify it
is working properly by plugging it into a power source and verifying it passes
self test.
1.
Figure 2-5. Connecting the power cord.
N o t e
The Series 3500yl and 6200yl Switches do not have a power switch. They are
powered on when the power cord is connected to the switch and to a power
source. For safety, the power outlet should be located near the switch
installation.
The switch automatically adjusts to any voltage between 100-127 and 200-240
volts and either 50 or 60 Hz. No voltage range settings are required.
If your installation requires a different power cord than the one supplied with
the switch, be sure to use a power cord displaying the mark of the safety
agency that defines the regulations for power cords in your country. The mark
is your assurance that the power cord can be used safely with the switch.
Connect the power cord supplied with the switch to the power connector
on the back of the switch, and then into a properly grounded electrical
outlet.
Installing the Switch
Installation Procedures
2-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Procurve 3500yl series6200yl

Table of Contents