Cisco Aironet 1400 Series Hardware Installation Manual page 46

Hide thumbs Also See for Aironet 1400 Series:
Table of Contents

Advertisement

Verifying Isolation
Slowly rotate the antenna of bridge D a few degrees to the left and to the right and verify that the
d.
RSSI level does not rapidly spike above 1.95 V. If the voltage peaks above 1.95 V, move the bridge
farther away and repeat this step.
After you verify the isolation of the second bridge link, you must properly set the root and non-root
Step 5
bridge settings for both links, align the link 2 bridge antennas, and verify proper link 2 operation.
Cisco Aironet 1400 Series Wireless Bridge Hardware Installation Guide. OL-4072-03
4-4
Chapter 4
Stacking Bridges
OL-4072-04

Advertisement

Chapters

Table of Contents
loading

Table of Contents