Figure 32. Checking the battery service date
3. Do one the following:

Preparing to move the DS4400 Storage Server

Remove each component CRU before moving the DS4400 Storage Server to a new
location or before removing the chassis from its rack cabinet. This helps safeguard
the equipment and ensures a smoother transition to the new environment.
If you are moving the DS4400 Storage Server a short distance, and you have
sufficient assistance or equipment, you might be able to move the DS4400 Storage
Server without removing each component CRU. If you do not have sufficient
assistance or equipment, use the procedure in "Moving or relocating the DS4400
Storage Server" on page 39 to safely move the equipment to its new location.
If you are moving the DS4400 Storage Server a significant distance, be sure to
pack it in its original shipping container.
38
IBM TotalStorage DS4400 Fibre Channel Storage Server: User's Guide
The Battery Support Information label on the front of the battery has three
dates:
v Date of Manufacture - Date the battery was built at the factory
v Date of Installation - Date the battery was installed in the DS4400 Storage
Server
v Replacement Date - Battery replacement date (see the note at the beginning
of this section)
v If it is time to replace the battery, install a new battery using the procedure
described in "Replacing a failed battery" on page 45.
v If it is not time to replace the battery, replace the DS4400 Storage Server
bezel, as shown in Figure 22 on page 23.