Chapter 4. Installation; Installation Requirements - Comtech EF Data Radyne RCS11 Installation And Operation Manual

1:1 redundancy switch
Table of Contents

Advertisement

4.1

Installation Requirements

The RCS11 can be installed within any standard 19-inch equipment cabinet or rack, and requires
1 rack unit (RU) of mounting space (1.75 inches) vertically and 21 inches of depth. Including
cabling, a minimum of 23-inches of rack depth is required.
There are no user-serviceable parts or configuration settings located
inside the RCS11 Chassis. There is a potential shock hazard internally at
the power supply module. DO NOT open the RCS11 Chassis under any
circumstances.
Before initially applying power to the unit, it is a good idea to disconnect
the transmit output from the operating ground station equipment. This is
especially true if the current RCS11 configuration settings are unknown,
where incorrect setting could disrupt existing communications traffic.
MN-RCS11 – Revision 9

Chapter 4. Installation

WARNING
CAUTION
4–1

Advertisement

Table of Contents
loading

Table of Contents