19-Inch Wiring Closet Rail Installing; Cabling Requirements - LevelOne GSW-0890 User Manual

8-port 10/100/1000mbps w/ 2-port sfp l2 managed switch
Hide thumbs Also See for GSW-0890:
Table of Contents

Advertisement

2-1-2. 19-Inch Wiring Closet Rail Installing

Caution: Allow a proper spacing and proper air ventilation for the cooling fan
at both sides of the chassis.
Wear a grounding device for electrostatic discharge.
Screw the mounting accessory to the front side of the switch (See Fig. 2-2).
Place the Chassis into the 19-inch wiring closet rail and locate it at the proper
position. Then, fix the Chassis by screwing it.

2-1-3. Cabling Requirements

To help ensure a successful installation and keep the network performance
good, please take a care on the cabling requirement. Cables with worse
specification will render the LAN to work poorly.
10
Fig. 2-2

Advertisement

Table of Contents
loading

Table of Contents