Installing Fittings And Burner Door; Positioning The Draft Diverter; Screwing Cleanout Cover Onto Rear - Buderus Logano G315 Installation And Service Instructions Manual

Low-temperature oil/gas boiler
Table of Contents

Advertisement

7.8

Installing fittings and burner door

Next step in the assembly process is to install the burner
door and draft diverter. The pre-assembled boiler comes
with these components already installed.
7.8.1

Positioning the draft diverter

KM ropes (Fig. 28, [1]) are used to seal the connections
between the boiler and the draft diverter (Fig. 28, [2]).
B Coat the packing grooves with adhesive (primer).
B Push the KM ropes firmly into the groove. Insert the
sealant rope in such a way that the joint is in the side
part of the groove (Fig. 28, [3]).
B Place the draft diverter onto the two threaded studs on
the rear section (Fig. 28, [4 and 5]) and secure using
washers and nuts.
Fig. 28 Fitting the draft diverter
Logano G315 - Subject to technical modifications
Boiler block assembly
7.8.2
Screwing cleanout cover onto rear section
Fig. 29 shows the fully equipped rear section with the
cleanout covers on the draft diverter (Fig. 29, 1 and 2])
and the cleanout covers on the rear section (Fig. 29,
[3 and 4]).
All cleanout covers are factory-fitted.
Fig. 29 Rear section with fittings installed
7
27