7.9
Boiler outer casing
This section describes how to install thermal insulation
and cladding components.
7.9.1
Fitting the profile rails
The folded edges of the front profile rails must face
forwards.
B An additional nut must be turned on each of the two
upper tie rods on the front of the boiler (Fig. 32, [2]).
B Insert the top front crosswise tie bar (Fig. 32, [1])
between the first and second nut of the tie rods in each
case and fasten to the cast lugs.
B Fully tighten the outside nuts.
B Screw the bottom front crosswise tie bar (Fig. 32, [3])
with two machine screws to the feet of the boiler front
section.
Fig. 32 Fitting the front profile rails
B Fasten top rear crosswise tie bar (Fig. 33, [1]) to the
cast lugs then to rear section with machine screws
(M 8 x × 15). The folded edge of the upper crosswise
tier bar must point towards the front.
Logano G315 - Subject to technical modifications
Boiler block assembly
B Screw the bottom crosswise tie bar (Fig. 33, [2]) to
the feet of the rear section with two machine screws
(M 8 x x 15). The folded edge of the bottom crosswise
tie bar must point towards the back.
Fig. 33 Fitting the back profile rails
7.9.2
Attaching the thermal insulation
B The thermal insulation provided corresponds to the
boiler size (Tab. 11). The thermal insulation must be
arranged on the boiler block as shown in Fig. 34.
B Push the thermal insulation under the boiler block in the
lower section of the boiler. The boiler feet are placed in
the cut-outs in the thermal insulation.
Fig. 34 Thermal insulation
H
Rear (boiler back)
V
Front (boiler front)
7
111"
(2820 mm)
V
H
6 720 642 621-28.1o