7
Boiler block assembly
7.4
Sliding the supply pipe into place
B Push the flat gasket (Fig. 21, [1]) over the supply pipe
(Fig. 21, [4]).
B Push the supply pipe from the front into the top boiler
hub.
B Close off with flange cover (Fig. 21, [2]).
The supply pipe must be fixed in such a way
that the holes on the supply pipe are
positioned at the correct angle. This ensures
optimum distribution of water in the area of
the top boiler hub.
B Make sure that the cam [3]) on the end
plate of the supply pipe (
fits in the notch in the top boiler hub
(
Fig. 21, [5]) (Thermostream principle).
Fig. 21 Installing the supply pipe
24
7.5
B Seal sensor well R ¾ (length: 110 mm) (Fig. 22, [1])
Fig. 21, [3])
Fig. 22 Fitting the sensor well
Sealing the immersion sleeve
from the top into the R ¾ tapped hole in the supply
connection (Fig. 22, [2]).
Logano G315 - Subject to technical modifications