Kohler COMMAND CV17-745 Service Manual page 50

Vertical crankshaft
Table of Contents

Advertisement

Kohler Engine Parts Call K&T 606-678-9623 or 606-561-4983
Section 5
Fuel System and Governor
Figure 5-31. Installing Accelerator Pump Housing
Screws and Hose.
8. Install the new clips onto each end of the new
vacuum hose, and connect the hose onto the
fittings. See Figure 5-31. Discard all the old parts.
Choke Repair
1. Remove the carburetor from the engine. Discard
the old mounting gaskets for the air cleaner and
carburetor.
2. Clean the areas around the choke shaft and the
self-relieving choke mechanism thoroughly.
3. Remove and discard the plastic cap from the top
of the choke lever/shaft assembly.
4. Note the position of the spring legs and the choke
plate for correct reassembly later. See Figure
5-32. Remove the two screws attaching the choke
plate to the choke shaft. Pull the shaft out of the
carburetor body and discard the removed parts.
Figure 5-32. Choke Details.
5.16
5. Use a screw extractor (easy out) and remove the
original choke shaft bushing with the old choke
lever from the carburetor housing. Save the
bushing to use as a driver for installing the new
bushing. Discard the old lever.
6. Clean the I.D. of both choke shaft bores as
required.
7. Insert the new bushing through the new choke
lever from the outside, and start the bushing in the
outer shaft bore. Position the choke lever so that
the protruding boss on the carburetor housing is
between the two stops formed in the choke lever.
See Figure 5-33.
Figure 5-33. Assembling Choke Lever.
8. Turn the old bushing upside down and use it as a
driver to carefully press or tap the new bushing
into the carburetor body until it bottoms. Check
that the choke lever pivots freely without
restriction or binding. See Figure 5-34.
Figure 5-34. Installing Bushing.
www.mymowerparts.com

Advertisement

Table of Contents
loading

Table of Contents