Power Failure (Ac Power); Installing Power Cord Clip - D-Link DGS-1510 Series Hardware Installation Manual

Gigabit ethernet smartpro switch
Hide thumbs Also See for DGS-1510 Series:
Table of Contents

Advertisement

DGS-1510 Series Gigabit Ethernet SmartPro Switch Hardware Installation Guide

Power Failure (AC Power)

In the event of a power failure, just as a precaution, unplug the power cord from the Switch. After the
power returns, plug the power cord back into the power soket of the Switch.

Installing Power Cord Clip

To prevent accidental removal of the AC power cord, it is recommended to install the power cord clip
together with the power cord.
1. With the rough side facing down, insert the Tie Wrap into the hole below the power socket.
2. Plug the AC power cord into the power socket of the Switch.
3. Slide the Retainer through the Tie Wrap until the end of the cord.
Figure 2-5 Insert Tie Wrap to the Switch
Figure 2-6 Connect the power cord to the Switch
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dgs-1510-20Dgs-1510-28Dgs-1510-28pDgs-1510-52

Table of Contents