Daikin BRC1C71 Engineering Data page 26

Controls vrv
Table of Contents

Advertisement

EDUS39-605
Sequential Start
Operation command from central control equipment
Each unit operates in sequence. For example, if you set simultaneous operation by the central remote controller for
groups 1-00 ~ 4-15, and 5-00 ~ 8-15, two outdoor units start simultaneously.
Registering Zone
It is possible to set multiple groups as one zone and control each zone separately.
No zones are registered when the unit is shipped from the factory.
Zone registration can be done in the individual screen, all screens, or the zone screen.
Registration
1.
Pressing the ALL/INDIVIDUAL button for four seconds.
1
Zone Number 1 is displayed, and if there are any groups already registered in the displayed zone, a
on the operation monitor.
2.
Select the Zone Number to be registered using the ZONE NUMBER button.
3
Keeping the button pressed down moves it rapidly.
3.
"
to the group you wish to
5
Keeping the button pressed down moves it rapidly.
4.
Press the SELECT button to register that group to the zone.
6
The
display lights up on all the selected units.
Pressing the RESET button removes the group from that zone, and
7
Repeat steps 3 and 4 until all the units you wish to register to the zone have been added.
In this example, a screen is shown with units 1-00, 1-02, 1-03, and 2-00 registered to Zone Number 1.
5. Repeat steps 2 to 4 to register to the next zone.
6. Once zone registration is complete,
and return to the individual screen.
The display returns to the normal screen if nothing is done for one minute when in zone registration mode.
NOTE:
It is impossible to register one group to several different zones.
If this is done, the last zone registered is effective.
Controls
register using the arrow keys.
4
2
press the ALL/INDIVIDUAL button to turn off ZONE SET display
1
Displays ZONE SET.
2
goes off.
Control Devices
will light up
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents