Table 1.19 Receive Scsi Bus Data & Information Phase Dt Timing Values - Fujitsu MBA3073 SERIES Technical Manual

Disk drives scsi physical interface specifications
Hide thumbs Also See for MBA3073 SERIES:
Table of Contents

Advertisement

Table 1.19
Timing description
1
ATN receive setup time
2
Flow control receive hold time
3
Flow control receive setup time
4
PCRC receive hold time
5
PCRC receive setup time
6
Receive assertion period (14)
7
Receive hold time (14)
8
Receive negation period (14)
9
Receive setup time (14)
10
Receive REQ(ACK) period tolerance
11
Receive REQ assertion period with P_CRCA
transitioning
12
Receive REQ negation period with P_CRCA
transitioning
13
Receive Skew Compensation
14
Receive Internal Hold Time
15
Receive Internal Setup Time
Fast-160 SCSI devices shall not change timing parameters between training or reset events.
Note:
(14) See Fig.1-20,21,22,23,24 for measurement points for the timing specifications. (15) SCSI bus
timing values specified by the maximum transfer rate for the given range shall apply even if a
slower transfer rate within the given range is negotiated.
C141-C015
Receive SCSI bus data & information phase DT timing values
Timing values [ns] (15)
Type
Fast-10
Fast-20
Min
13.6
7.8
Min
11.6
5.8
Min
18.6
12.8
Min
11.6
5.8
Min
18.6
12.8
Min
80
40
Min
11.6
5.8
Min
80
40
Min
11.6
5.8
Min
0.7
0.7
Min
85.5
48
Min
85.5
48
Max
N/A
N/A
Min
N/A
N/A
Min
N/A
N/A
Fast-40
Fast-80
Fast-160
4.9
3.45
3
2.9
1.45
3
9.9
8.45
3
2.9
1.45
N/A
9.9
8.45
N/A
20
8.5
4.74
2.9
1.45
-0.08
20
8.5
4.74
2.9
1.45
-6.33
0.7
0.7
0.06
32.5
21
N/A
32.5
21
N/A
N/A
N/A
4.4
N/A
N/A
0.345
N/A
N/A
0.345
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mba3147 seriesMba3300 nc seriesseries

Table of Contents