Figure 14. Plugging In The Ac Power Cord - Allied Telesis AT 8000/8POE Installation Manual

Layer 2 fast ethernet switch
Table of Contents

Advertisement

Figure 14. Plugging in the AC Power Cord

2. Plug the other end of the power cord into a wall outlet.
Warning: Power cord is used as a disconnection device. To de-
energize equipment, disconnect the power cord.
Pluggable Equipment. The socket outlet shall be installed near
the equipment and shall be easily accessible.
3. Verify that the POWER LED is green. If the LED is OFF, refer to
Chapter 3, "Troubleshooting" on page 51.
The switch is now powered on and ready for network operations. To
start a local management session on the switch, refer to "Starting a
Management Session" on page 46. To start a remote management
session, the switch must have an IP address. For information about
giving the switch an IP address and starting a remote management
session, refer to the AT-S81 Management Software User's Guide.
AT-8000/8POE Layer 2 Fast Ethernet Switch Installation Guide
2 A
5 0 -
6 0 H
z
1 0 0
- 2 4
0 V
A C
830
E3
E5
45

Advertisement

Table of Contents
loading

Table of Contents

Save Article as PDF