Chapter 2 Server Installation; 2-1 Overview; Unpacking The System; Preparing For Setup - Supero SUPERSERVER 8026B-6RF User Manual

High-end quad processor server
Table of Contents

Advertisement

2-1 Overview

This chapter provides a quick setup checklist to get your 8026B-6RF/8026B-TRF
up and running. Following these steps in the order given should enable you to have
the system operational within a minimum amount of time. This quick setup assumes
that your system has come to you with the processors and memory preinstalled. If
your system is not already fully integrated with a serverboard, processors, system
memory etc., please turn to the chapter or section noted in each step for details on
installing specifi c components.
2-2

Unpacking the System

You should inspect the box the 8026B-6RF/8026B-TRF was shipped in and note
if it was damaged in any way. If the server itself shows damage you should fi le a
damage claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the 8026B-6RF/8026B-
TRF. It should be situated in a clean, dust-free area that is well ventilated. Avoid
areas where heat, electrical noise and electromagnetic fi elds are generated. You
will also need it placed near a grounded power outlet. Be sure to read the Rack
and Server Precautions in the next section.
2-3

Preparing for Setup

The box the 8026B-6RF/8026B-TRF was shipped in should include two sets of rail
assemblies, two rail mounting brackets and the mounting screws you will need to
install the system into the rack. Follow the steps in the order given to complete
the installation process in a minimum amount of time. Please read this section in
its entirety before you begin the installation procedure outlined in the sections that
follow.
Chapter 2
Server Installation
2-1
Chapter 2: Server Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Superserver 8026b-trf

Table of Contents