Alcatel-Lucent 5620 User Manual page 121

Service aware manager
Hide thumbs Also See for 5620:
Table of Contents

Advertisement

21
Click on the Select button. The Select a Network Element - Define Source Site
form opens. Choose a 9500 MPR from the list and click on the OK button. The
Select a Network Element - Define Source Site form closes and the IP address of
the selected 9500 MPR appears in the Starting Network Element parameter.
22
Click on the Next button. The Define the Provisioned Path step appears.
23
Click on the Insert Hop button to insert a VLAN path hop. The Hop for New VLAN
Path (Create) form opens.
24
Click on the Select Network Element button. The Select a Network Element - New
VLAN Path form opens.
25
Choose a 9500 MPR from the list and click on the OK button. The New VLAN Path
form closes and the IP address of the NE appears in the Network Element
parameter.
26
Click on the Select Link button. The Select Links - New Vlan Path form opens.
27
Choose a link from the list and click on the OK button.
28
If you need to add another hop, click on the Apply button and repeat steps
to 27. Click on the OK button after you add the required hops.
29
Close the Hop for New VLAN Path (Create) form. Go to step 51.
30
Configure the parameters:
31
Perform one of the following:
a
b
32
Click on the Next button. The Specify if the Vlan Path is a Point to Multipoint step
appears.
33
Configure the Is Point to Multipoint parameter.
34
Click on the Next button. The Define Head step appears.
35
Click on the Select button. The Select a Network Element - Define Head End form
opens. Choose a 9500 MPR from the list and click on the OK button. The Select a
Network Element - Define Head End form closes and the IP address of the selected
9500 MPR appears in the Head End parameter.
36
Click on the Next button. The Possible Vlan Paths step appears.
37
For the non-Auto option, click on the Insert Hop button to insert a VLAN path hop.
The Hop (Create) form opens.
Alcatel-Lucent 5620 Service Aware Manager, Release 11.0 R5
3HE 08459 AAAA TQZZA Edition 01
MPR User Guide
Max Sites
Minimum Bandwidth (kbps)
Select Shortest Path
If you set the Creation Type parameter option in step
step 32.
If you set the Creation Type parameter option in step
to step 41.
10 — 9500 MPR VLAN service management
5
5
September 2013
23
to Auto, go to
to Point 2 Point, go
10-7

Advertisement

Table of Contents
loading

Table of Contents