Hans Grohe II Installation Instructions / Warranty page 5

Hans grohe showerpanel installation instructions / warranty
Table of Contents

Advertisement

Available languages

Available languages

Installation � flat wall
Wrap the threads on the nipples with Teflon tape.
Install the elbows so that the outlets face upwards.
Measure up the wall 78 ¾", making sure that the line is
plumb. Mark the position for the top screw hole.
From the position of the top screw hole, measure down
35 3/8". Mark the position for the center screw hole.
From the center screw hole, measure down 19 1/8".
Mark the position for the bottom screw hole.
Use a 6 mm bit to drill the three screw holes.
Seal the wall around the anchors
with waterproof sealant.
Failure to seal the wall can lead to
possible water damage.
Install the set screws in the top and bottom holes.
Use a 10 mm nut driver to attach a nut to the top set
screw.
Slide the panel over the top and bottom set screws.
Tighten the nut on the top set screw.
Install and tighten the nut on the bottom set screw.
Install one recessed head screw and the large washer
on the center hole. Tighten the screw.
English
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents