Step 2: Cabinet Preparation - Thermador P24GE Installation Instructions Manual

Professional cooktops
Table of Contents

Advertisement

Available languages

Available languages

Step 2: Cabinet Preparation
FIG. 5 Side View of Cooktop
Low Back
required
when
there
is tess than
12" horizontal
clearance
from back of cooktop
to combustible
matedat.
With more than 12" of
clearance,
the Island Trim may be used.
FIG. 6 Projecting
from
Cabinet
Front
1=3/8"
Front projects outward 1o3/8" as
shown from standard 24"-deep
base,
FIG. 7 Flush to Cabinet
Front
* Provide
clearance
for screws by
increasing
cutout height by 1/16"
or by notching
in the location
of
the three screws,
_>" N otch
Depth
Front flush with cabinets;
minimu mof 25=3/8" cabinet
depth required.
HG. 8 mnstaLlation
of 48" Cooktop
above
two
side=by=side
Thermador
Warming
Drawers,
Model
No. WD24
Minimum 3/4"
Side View
t
7-W16"
Plywood support
"_(19,8 cm)
[
Install additional
`2#
wood support along
front edge of cutout
P
3/4" (70 ram) minin
between cutot
1-7/8" ( 4,8cm)
H0riz0ntd Distance Between Cutouts
2-3/4"(7 cm) VerticalDistance
Between Cutouts
(See Side View for Wood Support)

Advertisement

Table of Contents
loading

This manual is also suitable for:

P24wkPc30Pc36Pc48

Table of Contents