Pellergy PB-1525 Installation & Operation Manual page 41

Wood pellet burner system
Table of Contents

Advertisement

PB-1525 Wood Pellet Burner System: Installation and Operation Manual
Rev 1.0, OCTOBER 2011
Place the controller in the Idle State and Technician Mode by following
the steps below:
1.) Power the unit in Technician Mode
2.) As soon as the controller enters the Purging State, press and hold
the Disable button.
3.) Once the unit has been Disabled, press the End button.
Once the unit is in the Idle State the controller interface button on the far
left will become the "Parm" of Parameter control button (See Figure 3.9
Above).
1.) Press the "Parm" button until the "Start Feed Time" is displayed on
the top line of the controller.
2.) Use the "+" and "-" buttons to adjust the amount of time displayed
on the controller. A good first test time is 33.0 seconds.
3.) Place a graduated container, that will allow you to measure pellets
in cups and/or ounces, under the conveyor drop tube.
4.) Initiate an "initial dump test" by pressing the "Test" button until the
specified test appears and then pressing the "Run" button.
5.) Upon running the test, the pellet conveyor will begin to rotate,
dropping pellets into the container. Wait for the test period to end,
at which time the conveyor motor will stop.
6.) Take a reading from the graduated container.
7.) If you have less that 2.1 (Volume) cups increase the start feed time
amount. If you have more than 2.1 cups decrease the start feed
time amount. Empty the container and repeat steps 1-6 until you
get 2.1 cups.
8.) Once the setting is correct, the value will be stored in nonvolatile
memory on the controller.
NOTE!
Remember to empty the measuring cup or collection device
between tests.
Page 41 of 67

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents