Installation of the Pellet Conveyor

When determining the location of the pellet conveyor mounting
position, the location of both the PB-1525 burner and the pellet hopper
must be considered
1. The conveyor is designed to be hung from a single-point overhead
anchor. Inspect the overhead in the vicinity of the PB-1525 burner
and select a suitable point for the overhead anchor. The conveyor
ASME Rated Cast Iron Boiler