GE P2S975 Installation Instructions Manual page 11

Self-cleaning dual fuel slide-in range
Hide thumbs Also See for P2S975:
Table of Contents

Advertisement

Available languages

Available languages

mnstaliation
mnstructions
I'_ 4-WIRE CONDUIT INSTALLATION
[]
[]
Loosen
the three
lower
terminal
screws
from
the terminal
block.
Remove
the
ground
screw
and ground
plate and
retain
them.
Cut and discard
the ground
strap.
DO NOT DISCARD
ANY SCREWS.
Insert
the ground
bare wire
tip between
the range
frame
and the ground
plate
(removed
earlier)
and secure
it in place
with
the ground
screw
(removed
earlier).
Insert
the bare wire
(white/neutral)
tip
through
the bottom
center
of the
terminal
block
opening.
Insert
the two
side bare wire
tips into the lower
left and
the lower
right
terminal
block
openings.
Tighten
the screws
until
the wire
is firmly
secured
(35 to 50 inch-lbs.).
Do not over-
tighten
the screws
since
it could
damage
the wires,
Before
/
I
Terminal
block
_
Ground
strap /
or
\Neutral
terminal
After
Terminal
_
.
block
/'_'Xt_
_
IL_
PIraluna
iVy-IV __
_1 ! t_J_...--.-_" (grounding
Wire tips _
,'_._-'_
to range)
\
Grour, , '/ill
_
Bracket
[]
Proceed
to Step
18.
[_] REINSTALL
WiRE COVER
NOTE:
When
reinstalling
the wire
cover,
make
sure that wires
do not become
pinched
between
the wire
cover
and the housing.
NOTE:
The ground
strap
must
be attached
when
using
the 3wire
cord.
- Terminations
must
be either
closed
toop
terminals
or open=end
spade
tugs.
On some
models,
a filter
capacitor
may
be connected
between
the black and
ground
leads
on the junction
block.
Do not remove
capacitor.
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the P2S975 and is the answer not in the manual?

Questions and answers

Table of Contents