Advertisement

1.

USER MANUAL

PROJECT TWO Mk2
PRE-AMP

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Project Two Mk2 and is the answer not in the manual?

Questions and answers

Summary of Contents for SPHINX Project Two Mk2

  • Page 1: User Manual

    USER MANUAL PROJECT TWO Mk2 PRE-AMP...
  • Page 2: Table Of Contents

    SPHINX Project Two Mk2 1. UNPACKING ............................3 2. SPHINX WARRANTY CARD ......................3 3. THE PRE-AMP AT A GLANCE......................4 Front panel..............................4 Rear panel ..............................5 4. INSTALLATION AND CONNECTIONS ....................6 Installation..............................6 Connecting the mains cable ........................6 Audio connections ............................6 Connecting the power amp ..........................
  • Page 3: Unpacking

    This manual will help you to gain a maximum damage. amount of pleasure and quality from your new In case of damage: please contact your Sphinx Sphinx Project Two Mk2 Pre-Amp. dealer immediately and retain all packing materials for possible proof of damage and possible claims.
  • Page 4: The Pre-Amp At A Glance

    SPHINX Project Two Mk2 3. THE PRE-AMP AT A GLANCE Front panel 1. INPUT: With this rotary knob you select one of 5. MUTE: Press this button to temporarily mute the the six inputs. Turn clockwise for an input to the sound.
  • Page 5: Rear Panel

    SPHINX Project Two Mk2 Rear panel 10 11 12 13 14 15 21 22 23 26 27 28 1. GROUND: You may directly connect the signal 11. BALANCED OUT L: To connect the XLR signal grounds of other equipment tot the signal ground cable (balanced cable) from the left input of the of the Project Two.
  • Page 6: Installation And Connections

    SPHINX Project Two Mk2 Connecting the power amp 4. INSTALLATION AND CONNECTIONS There are three outputs: OUT 1, OUT 2 (unbalanced cinch) and Balanced Out (balanced XLR). All three can be used simultaneously. Installation Balanced The Project Two will not become very hot so placement is not critical.
  • Page 7: Connecting A Cd Player

    Connecting the optical cables The CD player may be connected in two ways. The Project Two has a CONTROL OUT optical connector so it can remotely switch other Sphinx Balanced components to stand-by. Connect the balanced output of a CD player to CD BALANCED.
  • Page 8: Operation

    SPHINX Project Two Mk2 Selecting an input 5. OPERATION You select the input with the large rotary knob INPUT: Connect the mains cable to a mains outlet. After you clockwise to the right of the selected one, have finished connecting all components, you can anti-clockwise to the left of the selected one.
  • Page 9: Sphinx Remote Control

    SPHINX Project Two Mk2 6. SPHINX REMOTE CONTROL This single Sphinx Remote Control lets you control all functions: not only of the Project Two, but of all other Sphinx equipment. Only the following buttons and indications of the Remote apply to the Project Two (the others will not...
  • Page 10: Operation

    SPHINX Project Two Mk2 Operation Encountering problems... The Sphinx Remote is used for several different Remote Control does not work models and can therefore transmit different control codes, depending on which model has been Wrong component selected Select the correct one selected with the select buttons (1.).
  • Page 11: Care And Maintenance

    This unit conforms to the EMC interference regulations from the EU and to the CE standards. This unit complies with safety regulation VDE 0860 and thus with international safety regulation IEC 65. Technical specifications can be changed by SPHINX without prior notice if technical developments make this necessary.

Table of Contents