Hood Installation; Prepare Ovens - XLT Ovens XLT Installation & Operation Manual

Xlt series oven & avi series hood
Table of Contents

Advertisement

66
Check all local codes prior to installation. Special requirements may be necessary
depending upon building material construction. It is the installing contractor's re-
sponsibly to ensure that the structure the hood is to be hung from meets all codes
WARNING
and can carry the hood weight.
Purchaser's Responsibility
It is the responsibility of the purchaser:
Thoroughly review the floor plans and specifications. The exact location of the oven must be
determined before installing the hood.
To unload, uncrate, assemble, and install the hood to it's intended location.
To ensure that electric utilities are installed on site in accordance with local building codes and
with the specifications in this manual.
To see that electric utilities are connected properly by a qualified installer using the proper
hardware.
To ensure a qualified installer has performed an initial start-up procedure.
Location should minimize long and twisted duct runs. Make efforts to have a straight clear path
to the roof fan curb.
All Hood supporting structures must be strong enough to support the weight of the hood and
shrouds. Refer to the Specifications page for weight.
Maintain the proper clearances from combustible materials according to International Me-
chanical code (IMC), and National Fire Protection Agency (NFPA) 96, and local mechanical
codes.
Remove two (2) screws from the oven lid. Save for re-use.

Hood Installation

Prepare Ovens

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the XLT and is the answer not in the manual?

Table of Contents

Save PDF