Axis 5570e User Manual page 69

Axis print servers
Hide thumbs Also See for 5570e:
Table of Contents

Advertisement

AXIS 5570e/AXIS 5670e User's ManualSection 5: Setting Up - IBM Mainframe (zSeries)
Verifying the
Communication Link
Procedures
Note:
The easiest way to test the communication is by sending a print job
to the AXIS 5570e/AXIS 5670e. If there are problems, press the test
button once to print the test page where you can find the present
SNA link status.
1. Power on the Print Server and wait for 2 minutes.
2. Press the test button once to print a test page and make sure
that the SNA status line is defined as either:
Idle
Actv
LU-1
LU-3
Please refer to the Parameter List and FAQ on the Axis Web site, if the status line
indicates that the SNA link is not active.
The AXIS 5570e/AXIS 5670e is now ready for use in the SNA
environment.
69

Advertisement

Table of Contents
loading

This manual is also suitable for:

5670e

Table of Contents