7.4.8 Restore to normal operation after EPO (Emergency Power Off)

UPS panel after activation of EPO
(Emergency Power Off) with Utility not
available, i.e. complete shutdown of the
UPS and LCD screen OFF.
In this case wait until Utility is again
available, then proceed to restart the
UPS as described below Points 1
through 3.
UPS panel after activation of EPO (Emergency Power Off) with Utility available.
All Contacts are open. Rectifier, Inverter and Static-Switch shutdown.
First operated unit
1. Reset the EPO (Emergency Power Off) button.
Press mute, to reset alarm and buzzer.
First operated unit
2. Connect the Battery to all Units by closing the external Battery Switch(es) or
Fuses.
3. Press "inverter off" ( O ) key on all Units.
Rectifiers start with blinking LED.
After pressing the "inverter off" key on the last unit of the parallel system, the
output of all Units connect to Bypass Utility.
The LCD screen shows: "LOAD ON BYPASS".
First operated unit
OPM_SGS_USM_10K_40K_0US_V010.doc
All other units of the system
All other units of the system
All other units of the system
Operating Manual SG Series 10, 20, 30 & 40 kVA
77/88