7.1.6 Restore to normal operation after "EPO – Emergency Power Off"
NOTE !
Make sure about UPS status with "EPO" activate of, & Q1 closed, Q2 open and the
battery breaker Q3 in ON in battery cabinet.
View of the panel after pressing the button "EPO":
All Contactors are open.
Booster, inverter and Static-Switch shutdown.
1.
Reset the button "EPO".
Press Alarm, to reset alarm and buzzer.
2.
Reset the UPS by entering the screen:
MENU/COMMAND MENU/INVERTER OFF
The load is supplied by the mains through the automatic
bypass.
The booster starts automatically.
The LCD screen must display the status:
APPLICATION ON BYPASS
3.
Switch ON the inverter by entering the screen:
MENU/COMMAND MENU/INVERTER ON
The load will be automatically transferred from mains to the
inverter.
The LCD screen must display the status:
APPLICATION ON UPS
Modifications reserved
OPM_LPS_3UO_50K_60K_0US_V010.doc
END OF PROCEDURE
LP 33
60kVA
APPLICAT. SUPPLY OFF
= 0%
01.06.2007
12:15:45
NR=255
Status=A588
4563:
EMERGENCY OFF
ACTIVATED
COMMAND MENU
INVERTER ON
INVERTER OFF
LP 33
60kVA
APPLICATION ON BYPASS
= xx%
COMMAND MENU
INVERTER ON
INVERTER OFF
LP 33
60kVA
APPLICATION ON UPS
= xx%