Unpacking The System; Rack-Mount System Assembly; Unpacking The Rack Mounting Hardware - NEC Express5800 320La User Manual

Hide thumbs Also See for Express5800 320La:
Table of Contents

Advertisement

Unpacking the System

Your system weighs approximately 132 pounds (60 kg). If
your system contains numerous optional boards and
peripheral devices, it will weigh more. To avoid personal
injury, make sure you have someone help you lift or move
the system.
When you receive your system if the shipping boxes are damaged, note the
damage, and if possible, photograph it for reference. After removing the
contents of the containers, keep the cartons and the packing materials. If the
contents appear damaged when you unpack the boxes, file a damage claim with
the carrier immediately.

Rack-Mount System Assembly

This section provides the instructions for assembling the rack-mount server unit
into a standard EIA 19-inch rack cabinet.

Unpacking the Rack Mounting Hardware

Although the rack mounting hardware is inspected and carefully packaged at the
factory, damage may occur during shipping. Follow these steps for unpacking.
1. Visually inspect the shipping containers; notify your carrier immediately of
any damage.
2. Carefully remove the rack mounting hardware and verify the parts. See
Figure 2-1 and Table 2-1. If parts are missing or the hardware is damaged,
notify your service representative.
!
WARNING
C
D
Figure 2-1. Rack Mounting Hardware
A
B
Setting Up the System 2-3

Advertisement

Table of Contents
loading

Table of Contents