Minitower Power Button, Indicators, And Suspend Button - NEC PowerMate VP75 User Manual

Hide thumbs Also See for PowerMate VP75:
Table of Contents

Advertisement

Press the power button to power-on the system (see Figure Section 2-10). The power
6.
lamp lights.
7.
Press the suspend button to place the unit in the power management mode.
Figure Section 2-10 Minitower Power Button, Indicators, and Suspend Button
The system has a built-in checking program that automatically tests the components at power-on.
One beep indicates that the system has successfully completed its power-on test.
If there is a problem, a series of beeps may occur. If this happens repeatedly after powering on
the system, power off the system and see Section 4 for troubleshooting.
If a problem occurs, and is not indicated by beeps, check the following items, then turn to Section
4 for troubleshooting. Check that:
n
the power switch for the system unit and monitor are on.
n
all cables and power cords are tightly connected.
n
the electrical outlet is working.
n
the monitor's brightness and contrast are adjusted properly.
n
all options are properly installed (see Section 3 for option installation).
NOTE: If the system displays a message indicating
that system settings have changed, run Setup (see
"System Configuration" later in this section).
Setup and Operation
2-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vp75dVp75mt

Table of Contents