Download Print this page

Genie IS Owner's Manual page 26

Advertisement

1. Check local
building
codes.
*
Does building code require permanent
wiring?
-
If not, skip to step 9.
2. Remove
power from circuit.
3. Remove
motor
cover (Fig. 64).
.
Remove 4 screws [41] from cover and slide off
back of power head.
4. Remove and discard
power cord.
.
Cut off power cord inside power head.
.
Remove and throw away power cord, strain
relief and knock-out.
5. Install suitable
entrance
bushing.
6. Connect
permanent wiring
to power head wires.
.
Connect white supply line to white wire.
Connect black supply line to black wire.
Connect ground to green wire (ground).
NO_!!! U\se ®n_;/ U L_ ecoqn?_;,d
wh-e nuJ_;
7. Replace
motor
cover.
.
Slide motor cover back on.
Replace and tighten 4 screws.
8. Reconnect
power to circuit.
9. Plug in door operator.
.
See warning above.
.
Plug door operator into a grounded
outlet.
.
Perform STB ® alignment
check (Fig. 6-2).
To correct the problem - the brackets are
flexible and can be adjusted slightly to bring
the system into alignment.
When the STBs are in alignment the red LED
will stop blinking and stay on.

Advertisement

loading