Unpacking The System; Moving The System To The Site - NEC HX4500 User Manual

Hide thumbs Also See for HX4500:
Table of Contents

Advertisement

Unpacking the System

Your system weighs approximately 207 pounds (94 kg). To
avoid personal injury, make sure you have someone help
you lift or move the system.
When you receive your system, inspect the shipping containers prior to
unpacking. If the shipping boxes are damaged, note the damage, and if possible,
photograph it for reference. After removing the contents of the containers, keep
the cartons and the packing materials. If the contents appear damaged when you
unpack the boxes, file a damage claim with the carrier immediately. To unpack
your system, see the unpacking instructions on the shipping carton.

Moving the System to the Site

Once you have selected the system installation site, move it as follows.
1. Casters are provided on the bottom of the server. Slowly push the server to
the selected installation location.
For safety reasons, be sure to attach the caster holders on
the casters when the system is at the selected site.
2. To stabilize the system, attach the caster holders on the casters as shown
below.
! CAUTION
! CAUTION
Setting Up Your System 2-3

Advertisement

Table of Contents
loading

Table of Contents