Common Configuration Tasks; Global Cflowd Components; Collector Components - Alcatel-Lucent 7750 SR OS Configuration Manual

Hide thumbs Also See for 7750 SR OS:
Table of Contents

Advertisement

Common Configuration Tasks

This section provides a brief overview of the tasks that must be performed to configure cflowd and
provides the CLI commands. In order to begin traffic flow sampling, cflowd must be enabled and
at least one collector must be configured.

Global Cflowd Components

The components common (global) to all instances of cflowd include the following parameters:

Collector Components

Components that are common to all collector configurations include the following parameters:
7750 SR OS Router Configuration Guide
Active timeout
Inactive timeout
Cache size
Overflow
Rate
Aggregation
Autonomous-system-type
Description
Cflowd
Page 447

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7750 sr series

Table of Contents