Figure 7-20. Position Bead On The Groove Step; Figure 7-21. Detailed Thermocouple Bead Placement; Figure 7-22. Third Tape Installation - Intel BX80570E8200 - Core 2 Duo 2.66 GHz Processor Design Manual

Thermal and mechanical design guidelines
Table of Contents

Advertisement

Figure 7-20. Position Bead on the Groove Step

Kapton*

Figure 7-21. Detailed Thermocouple Bead Placement

Figure 7-22. Third Tape Installation

94
tape
TC Wire with Insulation
IHS with Groove
Case Temperature Reference Metrology
TC Bead
Thermal and Mechanical Design Guidelines
Wire section
into the
groove to
prepare for
final bead
placement

Advertisement

Table of Contents
loading

Table of Contents