Installation Checklist - Patton electronics SMARTNODE 4110 Series Getting Started Manual

Voip gateway routers
Hide thumbs Also See for SMARTNODE 4110 Series:
Table of Contents

Advertisement

Model 4520 & 4110 Series Getting Started Guide

Installation checklist

The installation checklist (see
Make a copy of this checklist and mark the entries as you complete each task. For each SmartNode 4520 or
4110 Series router, include a copy of the completed checklist in your site log.
Network information available & recorded in site log
Environmental specifications verified
Installation site pre-power check completed
Additional equipment available
All printed documents available
SmartWare release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Initial configuration performed
Planning the installation
table
5) lists the tasks for installing a SmartNode 4520 or 4110 Series router.
Table 5. Installation checklist
Task
Site power voltages verified
Required tools available
Cable length limits verified
Initial operation verified
Verified by
Date
3 • Installation
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents