F
D-4 VLAN 300 M
P
IG
EMBER
ORT
5. On the PVID settings, configure port 1 and port 2's PVID to 100, port 3 to port 5's PVID to 200 and
port 6 to port 7's PVID to 300.
F
D-5 PVID C
IG
ONFIGURATION
After making above configuration and save them, both workgroup can connect to port 1 and port 2 but
can not connect each other.
- 274 -