1. Package Contents Thank you for purchasing PLANET Industrial Wall-mount Gigabit Ethernet Router, WGR-500 series. The table below shows the models with the number of ports: Model Name 10/100/1000T Copper Ports 802.3at PoE + Ports 2.4’’ LCD WGR-500 WGR-500-4P WGR-500-4PV ...
2. Requirements z Workstations running Windows XP/2003/Vista/7/8/2008/10, MAC OS X or later, Linux, UNIX, or other platforms are compatible with TCP/IP protocols. z Workstations are installed with Ethernet NIC (Network Interface Card) z Ethernet Port Connection Network cables -- Use standard network (UTP) cables with RJ45 connectors. ...
The Industrial Router features a strong dual power input system (Terminal block and DC jack) incorporated into customer’s automation network to enhance system reliability and uptime. Power Input Range 3-pin Terminal Block DC Jack Model WGR-500 12~48V DC 12~48V DC WGR-500-4P 48~56V DC 48~56V DC WGR-500-4PV 48~56V DC...
DC 12~48V power input. Should you have the issue of power connection, please contact your local sales representative. 2.1mm DC Receptacle 2.1mm +48~56V for each slot DC receptacle is 2.1mm wide that conforms to the WGR-500 series 2.1mm DC jack's central post. Do not install any improper unit.
Step 1: There are 4 holes with 8mm diameter on the wall mount bracket of the Industrial Router; the distance between the 2 holes is 165mm of WGR- 500-4PV and WGR-500-4P, 133mm of WGR-500, and the line through them must be horizontal.
Page 8
Step 3-1: Screw the bolts into the conductor pipe. The Industrial Router is between bolts and conductor pipe, as shown below. Figure 4-3: Router is screwed to the wall Step 3-2: Insert screws into the wall anchors, leaving 2mm of each screw exposed.
4.2 DIN-rail Installation The DIN-rail kit is included in the package. When the wall-mount application for the Industrial Router needs to be replaced with DIN-rail application, please refer to the following figures to screw the DIN-rail on the Industrial Router. To hang up the Industrial Router, follow the steps below: Step 1: Screw the DIN-rail bracket on the Industrial Router.
Step 3: Check whether the DIN-rail is tightly on the track. Figure 4-7: Router is tightly fixed on the track 4.3 Magnet Installation To install the Industrial Router on a magnetic surface, simply follow the following diagram: Figure 4-8: Router is magnetically installed...
5. Web-based Router Setting Starting Web Management The following shows how to start up the Web Management of the Industrial Router. Note the Industrial Router is configured through an Ethernet connection. Please make sure the manager PC must be set to the same IP subnet address. For example, the default IP address of the Industrial Router is 192.168.1.1, then the manager PC should be set to 192.168.1.x (where x is a number between 1 and 254, except 100) and the default subnet mask is 255.255.255.0.
Page 12
3. After entering the password, the main screen appears as Figure 5-3 shows. The following web screen is based on the WGR-500-4PV. The display of the WGR-500-4PV is the same as those of the WGR- 500-4P and WGR-500. Note Figure 5-3: Web Main Screen of Industrial Router The Router Menu on the left of the Web page lets you access all the commands and statistics the Industrial Router provides.
Page 13
Now, you can use the Web management interface to continue the Industrial Router management. Please refer to the user’s manual for more. For the WGR-500 and WGR-500-4P, if you would like to set in a different mode between Router and Switch, it can be configured by DIP switch found on the bottom case as shown in the diagram.
6. LCD Touchscreen Router Setting The WGR-500-4PV is equipped with a 2.4-inch color LCD touch screen with management functions. Tap the LCD touch screen to wake the LCD touch screen. Figure 6-1: To wake the LCD touch screen Starting Touchscreen Setup Wizard The wizard will guide your through the setup of your Industrial Router.
Page 16
Congratulations, the Industrial Router is now successfully configured. You may now attach the xDSL/fiber/cable modem and Ethernet equipment to the wired ports on the front panel of the Industrial Router. The Settings menu allow user to access different router and PoE features. Tap Up/ Down to access all settings.
Page 17
You can use the Web management interface and click LCD, and then in the LCD Management, change LCD configuration. Please refer to the user’s manual for more.
7. Recovering Back to Default Configuration IP Address has been changed or admin password has been forgotten – To reset the IP address to the default IP address “192.168.1.1” or reset the login password to default value, press and hold the reset button on the front panel for about 5 seconds.
8. Customer Support Thank you for purchasing PLANET products. You can browse our online FAQs resource and User’s Manual on PLANET Web site first to check if it could solve your issue. If you need more support information, please contact PLANET support team. PLANET online FAQs: http://www.planet.com.tw/en/support/faq Switch support team mail address: support@planet.com.tw WGR-500 Series User’s Manual: https://www.planet.com.tw/en/support/downloads?&method=keyword&keyword=W...
Need help?
Do you have a question about the WGR-500 and is the answer not in the manual?
Questions and answers