Procedure - Siemens NCM S7 Manual

Simatic net ncm for industrial ethernet
Table of Contents

Advertisement

Configuring Communication Connections
4.1

Procedure

Steps
The following steps are necessary to operate connections on the SIMATIC S7 PLC
with the Ethernet CP:
Configuring
Create new
connections
Configure connection
properties.
necessary steps
optional steps
Figure 4-1
Operating Connections with the Ethernet CP
84
If necessary,
configure "Other
Station" for
connections using the
appropriate tool.
Download connection configurations
to the CP
Programming
Program the
SEND/RECEIVE interface in
the user program.
(Refer to Section 3.2 and the
detailed FC description in
Chapter 5).
SIMATIC NET NCM S7 for Industrial Ethernet
C79000-G8976-C129–06

Advertisement

Table of Contents
loading

Table of Contents