Configuring Communication Connections
Table 4-3
Actions That Can Cause Changes to Configured Connections, continued
Action
Deleting a remote station.
Changing the subnet
assignment of the CP.
Display (Example)
The status of connections is displayed in the "Properties ISO Transport
Connection" dialog in the "Overview" tab.
Figure 4-5
Status of the Connections in the "Overview" Tab (Example of ISO Transport Connections)
Notice
If you replace one CP with another, this must provide at least the same services
and have at least the same version.
98
Consequences for the
Connections
The connections of the stations
in the project to remote stations
remain without assignment in
the connection table. In the
"Overview" tab of the Properties
dialog, the connections are
identified with "!".
The connections that were
assigned via the CP remain
without an assignment in the
connection table. In the
"Overview" tab of the Properties
dialog, the connections are
identified with "!".
How to Establish the Connection
Again
Reassign a remote station (or even a
local station) using the menu option Edit
"
Connection Partner....
Reassign the connections using the
"
menu option Edit
Connection
Partner... or in the "Addresses" tab of
the properties dialog for the connection.
SIMATIC NET NCM S7 for Industrial Ethernet