3. Mount the Switch
After the switch passes self test, it is ready to be mounted in a stable location.
The 2610 Switches can be mounted in these ways:
Rack or Cabinet Mounting
The 2610 Switches are designed to be mounted in any EIA-standard 19-inch
telco rack or communication equipment cabinet. Note that the mounting
brackets have multiple mounting holes and can be rotated allowing for a wide
variety of mounting options. Secure the rack in accordance with the
manufacture's safety guidelines.
W A R N I N G
For safe operation, please read the mounting precautions on
page
E q u i p m e n t
The 12-24 screws supplied with the switch are the correct threading for
C a b i n e t
standard EIA/TIA open 19-inch racks. If installing the switch in an equipment
cabinet such as a server cabinet, use the clips and screws that came with the
N o t e
cabinet in place of the 12-24 screws that are supplied with the switch.
Mounting Location
Non-PWR Switches
In a rack or cabinet
On a horizontal surface
On a wall
2-3, before mounting a switch.
PWR Switches
Yes
Yes
Yes
Yes
Yes
No
Installing the Switch
Installation Procedures
2-9