HP ProCurve 2610 Installation And Getting Started Manual page 110

Hide thumbs Also See for ProCurve 2610:
Table of Contents

Advertisement

pin-outs
twisted-pair cables ... B-4
PoE LED patterns ... 4-8
PoE troubleshooting ... 4-8
port configuration
checking when troubleshooting ... 4-3
port LEDs
description ... 1-8
normal operation ... 2-8
ports
10/100Base-TX, location on switch ... 1-4
connecting to ... 2-16
console ... 2-26
HP Auto-MDIX feature ... B-4
network connections ... 2-16
power connector ... 1-12
Power LED ... 1-5
behavior during self test ... 2-8
behaviors ... 1-5
location on switch ... 1-4
power source
connecting the switch to ... 2-16
Power-over-Ethernet
PoE ... 2-19
PoE power ... 1-2
precautions
mounting the switch ... 2-3
power requirements ... 2-3
preparing the installation site ... 2-6
Proactive Network tools
diagnostics with ... 4-9
ProCurve 600 Redundant and External Power
Supply ... 1-3
ProCurve 610 External Power Supply ... 1-3
R
rack
mounting precautions ... 2-3
mounting the switch in ... 2-9
recycle statements ... D-1
Redundant and External Power Supply ... 1-3
RPS/EPS ... 2-19
Redundant Power Supply ... 2-19
regulatory statements ... C-8
4 – Index
Reset button
description ... 1-10
location on switch ... 1-4, 1-10
restoring factory default configuration ... 4-12
resetting the switch
factory default reset ... 4-12
location of Reset button ... 1-10
troubleshooting procedure ... 4-10
RPS/EPS ... 2-19
cables ... 2-20
connecting to a switch ... 2-22–2-24
operation ... 2-20
S
safety and regulatory statements ... C-1
safety specifications ... A-4
segment switch
sample topology ... 2-29, 2-33
self test
Fault LED behavior ... 2-8
LED behavior during ... 2-8
Power LED behavior ... 2-8
Self Test LED ... 1-7
behavior during factory default reset ... 4-12
behavior during self test ... 2-8
serial cable
for direct console connection ... 2-27
SFP ports ... 1-2
slots for mini-GBICs
location on switch ... 1-4
specifications
acoustic ... A-3
cable length ... A-3
cabling ... B-1
connectors ... A-3
distance ... B-2
electrical ... A-1
environmental ... A-2
physical ... A-1
safety ... A-4
straight-through cable
pin-out ... B-6, B-8
subnet mask
configuring ... 3-2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents