Power-on the switch and check LEDs

Prerequisites
The switch does not contain a power on/off switch. It is turned on by connecting the AC power cord to the
switch and an AC power source.
Check LEDs for proper switch operation. For further detail see

Power off the switch

Prerequisites
Remove the power cord from the switch and from the power source.

Mount the Switch

The supported mounting options for the Aruba 9300-32D switch include:
Aruba X472 2-post Rack Kit (JL482C)
Aruba X474 4-post Rack Kit (JL483C; sold separately)
See
Installation Precautions and Guidelines on page 20
NOTE: Airflow and air temperature within an equipment rack can be variable and are dependent on the overall
rack configuration. In some configurations, there may be insufficient or recirculating airflow that causes the
switch to operate at elevated temperature. Position and orientation should be considered when configuring the
switch within the rack to minimize these effects and maintain compliance with the switch's temperature limits.

Two-post Rack Mount Option

The switch is designed to be mounted in any EIA-standard 2-post rack or communication equipment cabinet
using the Aruba X472 2-Post Rack Kit (JL482C).
For safe operation, please review the mounting precautions in
mounting a switch.
The 12-24 screws supplied with the two-post rack mount kit are the correct threading for standard EIA/TIA 2-post
racks. If installing the switch in an equipment cabinet such as a server cabinet, plan which holes you will be using
and use the clips and screws that came with the cabinet in place of the 12-24 screws that are supplied with the
two-post rack mount kit.
1. Use a Philips screwdriver to remove ten 6-mm M4 screws shown below and retain the screws for the
following step.
HPE Aruba Networking 9300-32D Switch Series | Installation and Getting Started Guide
Checking the Switch LEDs on page 44
before mounting your switch.
Installation Precautions and
Guidelines, before
23